Shop-Window Display: Buyer Selection Guide
A window display is selected for viewing through storefront glass, normally from the indoor side. Compare finished-display luminance, reflection control, ventilation and dimming. High brightness alone does not establish suitability for exposed rain or direct-sun outdoor installations.
Selection and sample acceptance
Define the site and content first. Verify the reference configuration, test a sample with the intended apps and signals, then confirm model, test conditions and supply scope in writing before ordering.
| Selection criterion | Evidence and acceptance check |
|---|---|
| Optical stack | Bonding reduces air-gap reflections; AR, AG and UV protection are separate options and require model-specific data. |
| Brightness and heat | Separate peak/typical/sustained front-surface readings. Agree glass, sunlight and temperature conditions. |
| Single / double-sided | Confirm each face and content control independently. HS50 indoor hanging specifications do not define WD-S/WD-D high-bright models. |
Prepare the RFQ
Model/size, quantity, destination, mounting, sunlight/temperature, supply voltage, daily schedule, apps/CMS and OEM requirements.
Request the specification revision, covered models, test conditions and applicable market documents. Reference specifications do not replace final configuration approval; unconfirmed options, power, lifetime and licensing require written verification.
Related product and configuration
High-Brightness Window Display Manufacturer
What should be checked for Optical stack?
Bonding reduces air-gap reflections; AR, AG and UV protection are separate options and require model-specific data.
What should be checked for Brightness and heat?
Separate peak/typical/sustained front-surface readings. Agree glass, sunlight and temperature conditions.
What should be checked for Single / double-sided?
Confirm each face and content control independently. HS50 indoor hanging specifications do not define WD-S/WD-D high-bright models.
How are delivery and warranty terms confirmed?
Lead time depends on model, quantity, customisation and destination. Samples, first article and production deliveries are scheduled separately in the confirmed quotation. By project quotation